| Year |
Client |
Project |
Location |
Contractual Position |
Contract Duration |
Details. Pipe dia, length, scope |
| 2005 |
Santos |
Onshore Facility Works & Mainline Valve Installation |
Pt Campbell Vic |
Head Contractor |
6 Weeks |
DN300 ML Valve, Civil & Pipe work Installation |
| 2005 |
GasNet Australia |
Pakenham Bypass Project |
Pakenham, Vic |
Head Contractor |
6 Weeks |
Approx 750m of 150mm supply pipeline |
| 2005 |
Santos |
Casino Onshore Gas Pipeline |
Pt Campbell Vic |
Head Contractor |
12 weeks |
12km of DN300 Steel welded Pipe 36km of DN50 Steel welded Pipe |
| 2004 |
John Holland Constructions |
Regional Fast Rail |
Sydenham - Bendigo |
Sub Contractor |
24 weeks |
80km Trenching |
| 2004 |
SA Water |
Clare Valley Stage 3 - Reticulation |
Clare Valley South Aust. |
Head Contractor |
11 weeks |
Approx 8km township reticulation |
| 2004 |
Clarence City Council Tasmania |
Coal River Valley Water Recycling Scheme Stg 2 |
Hobart, Tasmania |
Head Contractor |
16 weeks |
18.5 km Pressure Pipeline |
| 2004 |
Dept. of Infrastructure, Energy & Resources Tas |
Coal River Valley Water Recycling Scheme Stg 1 |
Hobart, Tasmania |
Sub Contractor |
8 weeks |
Installing 6.3km Pipeline |
| 2003 |
South Australia Water |
Clare Valley Water Supply Stage 2 |
Clare Valley South Aust. |
Head Contractor |
20 weeks |
Approx 37km Water Supply Pipeline |
| 2003 |
Goulburn Valley Water |
Welsford St Water Treatment Plant Pipeline |
Shepparton VIC |
Head Contractor |
16 weeks |
Approx 10km Alum sludge outfall pipeline |
| 2003 |
South Australia Water |
Clare Valley Water Supply Stage 1 |
Clare Valley, South Aust. |
Head Contractor |
12 weeks |
13.8 km Water Supply Pipeline |
| 2003 |
Goulburn Murray Water |
Normanville Pipeline |
Normanville VIC |
Head Contractor |
22 weeks |
190km Pressure Pipeline of assorted diam. |
| 2003 |
Clough Engineering |
HDD Drill Bass Gas Shore Crossing |
Kilcunda VIC |
Subcontractor |
12 weeks |
355od Steel Gas Pipeline for Horizontal Drill Section |
| 2003 |
Quiprite |
Yungera trenching |
Robinvale, VIC |
Sub contractor |
|
47km trenching for AG. Drain |
| 2003 |
Quiprite |
Boort Irrigation |
Boort, VIC |
Sub contractor |
4 weeks |
Water Main |
| 2002 |
Goulburn Murray Water |
Woorinen Pipeline Project |
Woorinen, VIC |
Head Contractor |
32 weeks |
80km of water line ranging from 225 to 1000 diam |
| 2002 |
South Australian Water |
Poochera to Streaky Bay Pipeline |
Streaky Bay, SA |
Head Contractor |
24 weeks |
Design & Construct 55km of water line from 150 to 200 diam |
| 2001 |
Walter Construction |
Gerringong to Gerroa Sewerage Scheme |
Gerringong NSW |
Subcontractor |
20 weeks |
9km of Sewerage Reticulation ranging from 100 to 450 diam |
| 2001 |
Lend Lease Developments |
Rising Main No.1 |
Mango Hill |
Head Contractor |
12 weeks |
2km of 375mm DICL, under road bore & assoc. Works |
| 2001 |
Lend Lease Developments |
Kerr Rd. Trunk Water Main |
Dakabin / Mango Hill |
Head Contractor |
12 weeks |
1.2km of 960 diam MSCL pipe, under road bore, etc. |
| 2001 |
Barossa Infrastructure Limited |
Barossa Water Supply Project |
Barossa Valley, SA |
Head Contractor |
32 weeks |
Design & Construct 187km of water line ranging from 150 to 960 diam |
| 2001 |
Nth Qld Water |
Douglas to Mt Jack Water Pipeline |
Nth Townsville |
Head Contractor |
24 weeks |
7.5km of fully welded 1290 diam MSCL water pressure main |
| 2000 |
Transfield Construction |
Mittagong Sewerage Reticulation |
Mittagong NSW |
Subcontractor |
45 weeks |
27km of 150 to 600 diam gravity and rising mains |
| 2000 |
Vivendi Water |
Aqua 2000, Transmission Pipeline |
Bendigo VIC |
Subcontractor |
40 weeks |
25km of 300 to 1167 DICL & MSCL pipelines |
| 2000 |
Goulburn Valley Water |
Wandong Reticulation Sewerage Scheme |
Wandong VIC |
Head Contractor |
36 weeks |
27 km of 200 mm dia PVC gravity pipeline and rising mains |
| 1999 |
NSW Dept of Public Works |
Wongabon Water Reticulation |
Dubbo NSW |
Head Contractor |
16 weeks |
24 km of 200 mm dia DICL water pipeline |
| 1999 |
South West Water |
Koroit Reticulation Sewerage Scheme |
Koroit VIC |
Head Contractor |
40 weeks |
23 km of 150 to 300 diam gravity pipeline and rising mains |
| 1999 |
Transfield Constructions |
Roxby Downs water transmission pipelines Stage 2 |
Roxby Downs |
Subcontractor |
28 weeks |
120km of DICL water pipeline |
| 1999 |
Gippsland Water |
Neerim Sth to Noojee water supply line |
Neerim Sth VIC |
Head Contractor |
20 weeks |
Design & Construct 16km of 200 diam water pipeline |
| 1999 |
Transfield Construction |
Ernest Henry Water pipeline |
Cloncurry to Julia Creek |
Subcontractor |
28 weeks |
134 km of 660 DICL and DICL RRJ water pipeline |
| 1998 |
Transfield Construction |
Century Zinc |
Queensland |
Subcontractor |
24 weeks |
300km 300mm Gas pipeline |
| 1998 |
Minson Construction |
Chiltern Valley to Koonoomoo Gas Transmission Pipeline |
Cobram to Chiltern |
Subcontractor |
28 weeks |
113 km of 150mm and 200mm dia steel gas pipe |
| 1997 |
Transfield Constructions |
Roxby Downs water transmission pipelines |
Roxby Downs |
Subcontractor |
28 weeks |
120km of DICL water pipeline |